Concept design
Plans, elevations and the look. Up to two rounds.

New homes, extensions and renovations. Plans, permits and approvals from one team that knows our walls back to front.
We take care of the whole process for you. No architects or convoluted processes, just honest design.
Plans, elevations and the look. Up to two rounds.
Only if council needs a planning permit.
We lodge, answer council's questions and handle any neighbour notice.
Detailed drawings for your building permit.
Engineer, energy rating and bushfire reports, coordinated by us.
We lodge with your building surveyor and answer their questions.



Rough order only, not to scale. How long each stage takes depends on your council and site.
Build a hemp home so good your friends won’t leave.








Hempcrete blocks · Hempcrete homes Architect and photographer credits to confirm before launch
One fixed fee by floor area. Not hourly. Pick your size.
All + GST. Not included: consultants, council fees and site supervision. Consultants are quoted first.
No handing you between consultants. We connect the dots.
Track record to add: projects, permits issued, years
Manages your project and is your main contact.
Joins the first meeting and reviews each design stage.
Detailing, wall systems and on-site questions.
$1,000+ GST
A separate stage with its own fee, before any design work starts.
Book an assessment





See all our projects Project and photos to choose
A planning permit is council's approval of what you build and where: its use, siting, height and anything an overlay controls. Not every project needs one.
A building permit approves how it's built: structure, fire safety and energy, checked against the building code. Almost every new home and extension needs one.
In NSW the matching approvals are a development application (DA) and a construction certificate.
For almost every new home, and most extensions and structural changes. Some minor work is exempt.
Your building surveyor or council confirms what applies to your project.
Your working drawings, engineering, energy rating and any consultant reports go to a registered building surveyor. They check it against the building code, ask any questions, then issue the permit.
If you need a planning permit, that comes first. We prepare and lodge it all for you.
A building surveyor is independent. They check your drawings against the building code, issue the building permit and inspect the work at set stages.
They can be private or from council. In NSW the same role is called a certifier.
Council deciding whether a project fits the planning rules for your site: its zone, overlays and local policy.
If your project needs a permit, our planning drawings and lodgement stages cover it. It comes before working drawings, because council can ask for changes.
Designs and documents your home, then takes it through approval.
Ours draws your home and is your main contact. Our chief designer reviews each design stage, and our technical lead details the walls.
The detailed set the building surveyor approves and your builder builds from: dimensioned plans, sections, details and schedules.
It depends on your site. Your property's planning report lists its zone and overlays, and those set what council asks for.
Most homes: a land survey, a soil test, a structural engineer and an energy rating.
Bushfire overlay (BMO): a bushfire assessment and BAL rating, often with a bushfire management plan.
Flood overlay: flood levels from the water authority, sometimes a flood report.
Heritage overlay: heritage advice on the design.
No sewer connection: a land capability assessment and a wastewater system design.
Fire engineer: usually only when a design needs a performance solution.
Your assessment finds which apply. We quote every consultant before you commit.
BAL means Bushfire Attack Level. It's set by the vegetation around your site, the slope and the distance to it, on a scale from BAL-LOW to BAL-FZ.
The higher the BAL, the stricter the construction rules for walls, windows and roof. A bushfire consultant assesses it.
We can help with one stage, or take you from concept to completion. Send us what you have.
No. Council and certifiers decide. We prepare the documents, manage the process and flag red flags early.